11. Working with the AI agent

This is not "manual mode." A common misconception: since RENAR requires human approvals, everything must be done by hand. The opposite is true — the bulk of the work (drafts of BR/SR/SPEC/TC, the initial interpretation of the TZ, the search for contradictions) is done by the agent. The human does not type artifacts; the human approves them at a few fixed points. This chapter shows how to load the standard into the agent, what commands to give, and what you get as output.

The normative delegation model — standard/05 Roles and the ADAPT approval points — standard/07 §7. The self-sufficient edition for the agent is RENAR-AGENT-EN.md (in the repository root and at renar.tech).


1. Who does what: the delegation map

The agent is an executor: it produces and maintains artifacts, but it does not own them and does not sign. The human is the owner and the one who approves. The boundary runs along fixed points:

Step The agent does The human approves
TZ import Registers the TZ as an immutable document, captures the client's signature — (the client signs when delivering the TZ)
Adversarial review A critic agent on a different model issues the verdict "findings present" / "no findings" The Architect records the verdict as evidence
ADAPT Prepares a draft: forward interpretation + backward findings The Architect's signature — and only theirs: the ADAPT is not put to the client
ACTZ Prepares a draft TZ clarification protocol from the findings Dual signature: client + contractor. Before it goes out, the Architect aggregates and rephrases the questions
Decomposition Creates BRSRSPECTR with provenance The Architect approves the transition to approved (QG-0)
Tests Writes TC pairs (positive + negative) — before the implementation and not by the agent that writes it The automated run records the result (QG-2)
Acceptance tests An isolated agent on a different model derives AT from the effective TZ alone The release gate: every AT green
Delivery Presents the business outcome The stakeholder accepts it (QG-4)

If human approval is not obtained, the artifact stays in draft, and the substrate blocks the transitions. The agent never declares itself the owner and never signs.

The boundary between the two loops. Everything shown to the client and signed is an obligation (ACTZ). Everything not shown is an interpretation (ADAPT). The agent MUST tell them apart: a question that requires a client decision goes into a draft ACTZ; it is not "filled in" inside the forward interpretation (standard/07 §7.13).


2. How to load the standard into the agent

The agent does not need the entire normative corpus — for everyday work a single file is enough.

  1. Download RENAR-AGENT-EN.md — the self-sufficient operational edition (≈400 lines): the artifact map, the workflow, ADAPT, the closed lists, the hard rules, the recording forms (frontmatter + body sections).
  2. Place the file beside the agent — in the project context, the system prompt, or as a session attachment (depends on your tool).
  3. Give the setup command: "Study this file — it is the RENAR standard. From now on do requirements engineering strictly by it."
  4. Optionally add project context: the registry of systems and subsystems, a link to your artifact substrate, the naming convention.

Attach the full corpus (standard/, reference/) only when a formal dispute over the exact wording of a norm arises — for most tasks the operational edition is enough.


3. How to give commands

Commands to the agent are ordinary natural-language statements tied to a workflow step. Below are typical examples; substitute your own identifiers.

TZ import and review:

Here is the client TZ (file TZ-2026-001). Register it as an immutable document.
Then run an adversarial review: issue the verdict "findings present" or "no findings",
with reasoning across the 7 categories (contradiction, gap, hidden assumption,
feasibility, regulatory, terminology, scope).

Creating an ADAPT (if there are findings):

The review found findings. Prepare an ADAPT draft: a forward interpretation by TZ
section plus backward findings. Do not fill in for the client — turn whatever is
unclear into a finding. The ADAPT is an internal document; it does not go to the client.

The TZ clarification protocol (ACTZ):

Collect the findings that require a client decision into a draft ACTZ — "TZ Clarification
Protocol No. 1". Phrase every clause in the language of obligations ("the domain is
compared case-insensitively"), not of interpretation, and add the contractor's proposal.
Status: draft — putting it to the client and signing it is my job.

Decomposition:

ACTZ-001 is signed by both parties and the ADAPT is approved. Set decided-in on the
protocol clauses in every closed finding. Derive a BR (business goal) from the ADAPT,
then SR (system behavior), then SPEC of the needed types. Set source and parent on
every artifact. Show the relationship graph before committing.

Tests:

For every normative statement in SR-03, write a TC pair: positive and negative.
The Pass criterion must be binary and observable. There is no implementation yet, and
there must not be: first we freeze the tests, then the code — and a different agent
will write the code.

Acceptance tests (a separate session, a different model):

Here is the effective TZ: TZ-2026-001 plus the signed ACTZ-001 and ACTZ-002. That is all
you have and all you will get — no requirements, no specifications, no tests, no code.
Derive the ATs: acceptance tests per contract clause, with a verbatim quote of the clause
next to the verification steps, in positive/negative pairs.

A good command names the input (which artifact), the action (what to produce), and the expectation (what to check). The agent handles the routine itself; step in where your decision is needed.


4. What you get as output

The agent returns not chat text but ready substrate artifacts — with machine-readable frontmatter and a body in fixed sections:

  • BR — the business need: who, what, why; success criteria; context with a reference to an ADAPT.
  • SR — system behavior: one requirement, behavior, constraints, link to SPEC.
  • SPEC-<TYPE> — a specification of one of the eleven types, linked to the SR via constrained-by[].
  • TC — positive/negative pairs with verifies[] pointing at the verified artifact.
  • ACTZ — a draft TZ clarification protocol: decision clauses in the language of obligations, status: draft until it is put to the client.
  • AT — acceptance tests referencing the TZ and the ACTZs only, with a verbatim quote of the contract clause and the provenance of the isolated generator.

Every artifact has its source set (origin from the TZ or an ADAPT) and, for AI-generated ones, an ai-provenance block (model, prompt template, the fact of a human edit). Ready copy-paste skeletons for all forms are in reference/12 Document templates.

The mark of good output: from any artifact a chain traces upward — to the SR, to the BR, to a TZ section. If the chain breaks, the artifact is not ready.


5. Points of human approval

Delegation to the agent is broad, but it has hard boundaries. A human is required in five places (normatively — standard/10 Lifecycle and quality gates):

  1. TZ signature — the client signs the contractual input; the agent only registers it.
  2. The ACTZ dual signature — the client and the contractor sign the TZ clarification protocol. This is the only place where an obligation to the client comes into being (§7.13).
  3. The Architect's signature on the ADAPT (QG-3) — the Architect confirms that every finding is worked through (each carrying a decided-in on a clause of a signed ACTZ) and that the interpretation is feasible. The client does not sign the ADAPT: they never saw it (§7.5).
  4. QG-0 approval — the Architect moves BR/SR/SPEC from draft to approved. Only after this is further decomposition allowed.
  5. Acceptance — the release gate on the ATs (all green) and, optionally, QG-4 on the business outcome.

Between these points the agent acts on its own. An attempt to make the agent sign, or to declare it Accountable, breaks the role model.


6. Who writes the test, and why it MUST be red

This is the one part of the work where the agent is explicitly forbidden to do everything at once — and the prohibition is substantive, not ceremonial.

Authorship isolation (standard/09 §9.18). A test written by the same agent that writes the code — and especially one written after the code — honestly checks what was written. But what it ought to check is the requirement, not the code. So the isolation rests on three axes:

Axis What it means in practice
Time The TC is frozen in ready before the task starts. The substrate will not let a TR open while the tests are unfrozen
Author The agent writing the TC is not the one writing the implementation: a different session or a different model
Change An edit to the Pass/Fail criteria of a frozen test is approved by an engineer; silently "nudging the test to fit the code" is not allowed

Red history (§9.18.2). A test never observed red is not evidence. The pinning run happens before implementation, and the test MUST fail: the functionality under test does not exist yet. Green on the pinning run is not a success but a signal to investigate: either the test checks nothing, or the functionality is already there.

There is one exception — tests of class implementation-originated (standard/06 §6.13): an internal technical detail added by the agent during implementation (a defensive check, logging) that is not observable by the client. Such a test is written after the code and is born green — by construction it has no red history. The compensation is mandatory: its teeth are proven by a killed mutant. And the class boundary is hard: client-observable behavior is not legalized through it — an obligation to the client cannot arise out of code.

Isolation of the AT generator (§9.19.2). The acceptance tests are derived by a separate agent on a different model, whose input is only the effective TZ. Access to the ADAPT, the BR/SR/SPEC, the TCs, and the code is forbidden — not out of hygiene, but because an AT is a simulation of the client's gaze. An agent that has seen the ADAPT will reproduce the same interpretation, and the ATs will start confirming it instead of the contract: the acceptance level collapses into the verification level.


7. A full session end to end

To dispel the sense of "magic", here is an end-to-end scenario — what the agent does and where the human steps in:

  1. You hand the agent the TZ and RENAR-AGENT-EN.md. The agent registers the TZ.
  2. A critic agent (a different model) runs an adversarial review → verdict "findings present".
  3. The agent prepares an ADAPT draft with the findings and a draft ACTZ. The Architect brings the protocol into a form the client can understand, puts it forward, and signs it together with the client → the ACTZ is signed; the findings receive their decided-in; the Architect approves the ADAPT with their signature.
  4. The agent derives BRSRSPEC, shows the relationship graph. The Architect approves QG-0.
  5. A test agent writes the TC pairs; the pinning run is red; the tests are frozen.
  6. A different agent writes the implementation until the tests turn green; the runner records the result (QG-2).
  7. Before the trials an isolated agent derives the ATs from the effective TZ and runs them. All green → the product can be submitted.
  8. The agent assembles the business outcome. The stakeholder accepts it (QG-4).

The human joins in to approve, not to type artifacts — but join in they must, and only they put a signature under an obligation.


8. Common mistakes

Mistake Why it is bad What to do instead
Asking the agent to "just write code" from the TZ The source of truth is lost — code without requirements Requirements first, then implementation derived from them
Skipping the adversarial review "No ADAPT needed" becomes a silent assumption The review is always mandatory; "no findings" is a recorded verdict of a different model
Letting the agent sign an ADAPT or an ACTZ The agent is not the owner or a signatory The signature is always a human: the Architect signs the ADAPT; the client and the contractor sign the ACTZ
Treating a finding as closed without a signed ACTZ The interpretation rests on a decision the client never made resolved only with a decided-in on a clause of a signed protocol
Sending the agent's raw output to the client as a protocol The client signs what they do not understand The Architect aggregates and rephrases the questions — in the language of obligations
Reconstructing SR from finished code Source-of-truth inversion Change the requirement → then the code; the exception is a justified bug-fix
Using one model to both generate and check No independence of review The critic is on a different model than the generator
One agent writes both the code and its test The test checks the code, not the requirement Different agents; the test is frozen before implementation and was red at least once
Letting the AT generator peek at the SRs or the ADAPT "for context" The ATs start confirming the interpretation instead of the contract Input: the effective TZ only; a different model; no internal loop whatsoever